Business Case
Ensuring that a major energy infrastructure project stays on schedule through Project Control
On behalf of a major player in the energy sector, SURFEO structured and managed the master schedule for a major infrastructure project in order to ensure reliable adherence to deadlines and to anticipate risks.
Meeting the deadlines for a major energy infrastructure project
Global investment in the energy transition reached a record high of USD 2,400 billion in 2024, up 20 per cent on the 2022–2023 average [1]. This momentum is fuelling a surge in major infrastructure projects, the delivery of which has become more complex, time-consuming and contentious: timelines are lengthening, costs are rising and the difficulties involved in coordinating stakeholders are rarely anticipated [2].
On these large-scale projects, managing deadlines is a key factor for success. A major player in the energy sector needed to organise and ensure the reliability of the master schedule for a complex energy infrastructure project, involving multiple work packages and numerous interfaces between engineering, procurement, construction, commissioning and project management.
SURFEO was commissioned to provide support with planning and project control: to structure, consolidate and manage the master schedule, analyse the critical path and provide the tools needed for management decision-making.
From the master schedule to critical path management
SURFEO worked in coordination with the engineering, procurement, construction, commissioning and project management teams to establish a reliable, shared planning framework.
- 01
Organise
Definition of the Work Breakdown Structure, activities, contractual milestones and interfaces between lots.
- 02
Plan
Creating and updating schedules using Primavera P6 and Microsoft Project.
- 03
Analyse
Integration of progress tracking, critical path analysis, monitoring of margins, dependencies and constraints.
- 04
To drive
Project Controls KPIs, dashboards, progress charts and scenario analyses.
Managing deadlines: a recurring weakness in major projects
- Budget overrun45%
- Missed deadline7%
- Delivery value deducted56%
McKinsey–Oxford study covering more than 5,400 projects [3]
- Large-scale projects exceed their budgets by an average of 45 per cent and their deadlines by 7 per cent, whilst the value delivered is 56 per cent lower than forecast [3].
- Only 0.5 per cent of megaprojects are delivered within budget, on time and with the promised returns [4].
- A failure to anticipate difficulties in implementation and in coordinating the various stakeholders is one of the main causes of the project going off course [2].
More reliable planning management and sound decision-making
Timelines under control
Enhanced control over deadlines throughout the project.
Anticipated risks
Deviations, margins and dependencies monitored to anticipate scheduling risks.
Informed decisions
KPIs, dashboards and scenario analyses to support management.
Improved reliability of control systems
Overall project management has been made more reliable through a consolidated master schedule.
- IRENA [1] Global investment in renewable energy reaches US$807 billion in 2024, November 2025. https://www.irena.org/News/pressreleases/2025/Nov/Global-Renewable-Energy-Investment-Hit-USD-807-Billion-in-2024-FR
- Office of the High Commissioner for Strategy and Planning [2] Major infrastructure projects: prioritising, simplifying, succeeding, January 2026. https://www.strategie-plan.gouv.fr/publications/grands-projets-dinfrastructures-prioriser-simplifier-reussir
- McKinsey – University of Oxford (trade press) [3] Study of over 5,400 projects: average budget overrun of 45 per cent and average delay of 7 per cent; a 56 per cent lower figure, projected for 2025. https://perfsystemique.fr/pourquoi-les-projets-ralentissent-execution/
- Database of Megaprojects (B. Flyvbjerg) [4] Only 0.5 per cent of megaprojects stay within budget, on schedule and deliver benefits, 2026. https://budgetoverrun.com/studies/flyvbjerg-megaproject-database